Project Overview
All Aspect Roofing was appointed by Oxfordshire County Council to replace the flat roof and drainage system at St. Andrew’s Church of England Primary School while the school remained open during term time. The existing roof was suffering from persistent leaks and water ingress, causing disruption to teaching and the day-to-day use of the building.
The project involved removing the worn roof covering and installing a new structural deck, insulation and high-performance warm roof system, alongside improvements to the drainage system. The works were designed to provide a durable, weather-resistant solution while maintaining a safe environment for pupils and staff throughout the refurbishment.
The Challenge
The existing flat roof had suffered extensive water ingress due to deteriorated waterproofing and inadequate drainage, causing ongoing disruption within the school. As the works took place during term time, careful planning was essential to maintain a safe environment for pupils and staff while keeping disruption to a minimum. Access and working areas were carefully managed throughout the project to allow the refurbishment to progress safely around the school’s daily activities.
The Solution
Survey and Roofing Specification
Following a detailed inspection, the existing felt roofing was removed and replaced with a new 18mm structural deck. The new roof was built up with a primer, vapour control layer, Parafoam Ultra insulation and the Langley TA-25 tapered warm roof system. The torch-applied system is backed by a 25-year guarantee and has an expected service life of 40 years, providing a durable and weather-resistant solution for the school.


Roof Preparation and Installation
The site was secured with scaffolding, safety fencing and appropriate signage before the roofing works began. The existing roof was stripped back to deck level, while the internal drainage outlets were made redundant and replaced with new external guttering. The new insulation and waterproofing system were then installed in a controlled sequence to provide a complete, weather-resistant finish.
Planning and Coordination
The project was carried out during term time while the school remained fully operational. The works were carefully phased to maintain a safe environment for pupils and staff, with regular communication between the client, site management team and school representatives. Controlled access and careful planning helped keep disruption to the school’s daily activities to a minimum.

How It Looks
The Results
The completed refurbishment provided a fully renewed warm roof system, improving waterproofing, drainage and the overall durability of the building. The new roof build-up includes a structural deck, insulation and vapour control layer, with the Langley TA-25 system backed by a 25-year guarantee and an expected service life of 40 years.
The project was completed on programme while the school remained open during term time. Careful planning and phased working kept disruption to a minimum, helping maintain a safe and comfortable environment for pupils and staff throughout the refurbishment.
Client Testimonial
Looking for a Similar Solution?
Every building and roofing project has its own requirements. Whether you are planning a roof replacement, refurbishment, maintenance programme or a new roofing system, our experienced team can assess your property and recommend the most appropriate solution. Speak to All Aspect about your project and find out how we can help.